SEWAGE TREATMENT TANK CASE STUDY
New Sewage Treatment Tank Installation in Keighley
Replacing a non-compliant septic tank with a modern sewage treatment system, including excavation, tank positioning and new drainage connections.
Replacing a Non-Compliant Septic Tank
Wharfedale Drain Services recently installed a new sewage treatment tank to replace an existing non-compliant septic tank in Keighley, West Yorkshire. The project involved excavating a substantial area of the garden, positioning the new tank and preparing the associated drainage connections. The photographs show the installation during the groundwork and pipework stages.
01 / Excavation
Preparing the ground for the new tank
A large excavation was formed to accommodate the replacement treatment tank. Careful groundwork created the space required for the tank and its connections, while allowing access for the installation equipment.
02 / Tank Installation
Positioning the sewage treatment tank
The new treatment tank was lowered into the excavated area and positioned ready for connection. The tank has two access covers on its upper surface, together with marked inlet and outlet connection points.
03 / Drainage Connections
Connecting the new drainage system
New underground drainage pipework was laid along an excavated trench leading towards the treatment tank. The installation photograph also shows a new inspection chamber and granular bedding material around the drainage route.
A replacement sewage treatment system
This project illustrates the excavation, tank installation and underground drainage work involved in replacing an older, non-compliant septic tank with a modern sewage treatment system.
Need to replace an old septic tank?
Wharfedale Drain Services can help with sewage treatment tank installations, septic tank replacements and associated drainage excavations. Contact the team to discuss your existing system and the options for your property.
Need A Free Estimate?
Please get in touch to discuss your requirements.
